Please use this identifier to cite or link to this item: https://publicaciones.fctunca.edu.py/jspui/handle/123456789/117
Full metadata record
DC FieldValueLanguage
dc.contributor.authorAranda González, Javier-
dc.contributor.authorEspínola Colmán, Sebastián-
dc.date.accessioned2020-01-02T12:59:50Z-
dc.date.available2020-01-02T12:59:50Z-
dc.date.issued2019-12-30-
dc.identifier.citationIEEEes
dc.identifier.urihttps://publicaciones.fctunca.edu.py/jspui/handle/123456789/117-
dc.descriptionProyecto final de grado 2019es
dc.description.abstractThe project consists of a design and sizing of a transmission line sectioning scheme in the Campo Dos Station, with the aim of providing a configuration that allows the station to be fed from any direction, either from the K30 Station or the Colonel Station Oviedo, which will give the Campo Dos Station greater reliability before an off-line service, due to failure or maintenance. For the resolution of the problem raised, the technical criteria to be taken into account in this work were defined. Such criteria are basically based on the solution being technically feasible, physical space available, need of moving of equipment, minimal interruption in service during construction and operating conditions for maintenance. Once these criteria were established, three bar configuration alternatives were proposed for a transmission line sectioning scheme, such as Single Bar, Double Bar and Main Bar with Transfer Bar. After an analysis of technical and economic feasibility of all proposed alternatives, it was concluded that the Simple Bar configuration is the most favorable, the one that best suits the established criteria. Finally, the final design and sizing of all the equipment involved in the new configuration and also a detailed budget was carried out. As a result there is a new configuration of the bar that will improve the reliability of the station since the transmission line can be sectioned with the new configuration.es
dc.description.sponsorshipANDEes
dc.language.isoeses
dc.publisherFCyT UNCAes
dc.relation.ispartofseriesProyecto Final de Grado;2019-
dc.subjectTransmisión de Energía eléctricaes
dc.subjectDistribución de energía eléctricaes
dc.subjectConfiabilidades
dc.subjectMantenimiento de equipos de potenciaes
dc.subjectSubestaciones eléctricases
dc.titleDISEÑO Y DIMENSIONAMIENTO DE UN ESQUEMA DE SECCIONAMIENTO DE LINEA DE 220 KV EN LA ESTACION CAMPO DOS (CDO), UBICADA EN EL DISTRITO DE J EULOGIO ESTIGARRIBIAes
dc.typeWorking Paperes
Appears in Collections:Proyectos Finales de Grado - Ingeniería en Electricidad

Files in This Item:
File Description SizeFormat 
PFG final_javier Aranda_compressed.pdfPFG Javier Aranda 20192,95 MBAdobe PDFView/Open


Licencia de Creative Commons
Todos los trabajos están bajo una licencia de Creative Commons Reconocimiento-NoComercial 4.0 Internacional